Cemex West Sacramento

Industrial

Location:

West Sacramento

IDA designed the foundations and anchorage design for one 10,000 gallon above ground concrete vault tank at New Fuel Island.

In addition, IDA analyzed seismic forces and strengthened anchorage to the foundation for a steel structure (shown above) being moved to the site.

« »