Spare Time Sports Club

Retail + Commercial

Location:

Oakley

Completion Date:

2008

Structural System:

Tilt-up concrete walls and steel framed floors/roof

Construction Cost:

Estimated at $5 Million

Two-story health club with tilt-up concrete walls and steel framed floors/roof.

Due to the level of fitness activity, the second floor was designed to meet strict vibration control criteria.

« »