Hayward Public Library

Public

Location:

Hayward

Square Footage:

58,000

Completion Date:

Expected in 2019

Structural System:

Concrete shear walls

LEED Certification:

Gold or Platinum Expected

New three-story, 58,000 square foot, 21st Century Library and Community Learning Center. The building is almost directly situated on the Hayward fault and utilizes special concrete shear walls as the lateral system.

The building features a parabolic stair cantilevering 25 feet and supported with curved tube steel members as analyzed for footfall vibration.

Utilizing an extensive rooftop solar panel array, the project is expected to be a net zero energy facility.

« »