St. Joseph of Notre Dame High School Marianist Hall

Education

Innovation

Seismic Retrofit

Worship

Location:

Alameda

Completion Date:
Structural System:

Concrete and wood frame

Construction Cost:

$3.5 Million

Seismic study, Probable Maximum Loss (PML) report and strengthening for two concrete and wood frame buildings built around 1935.

Strengthening measures included fiberwrapping columns without impacting the architecture.

« »